GSK Practical / Journal Notes
TASK
NO. |
TASK |
Part-2 |
Navigation
at support level |
Take a reading of dry and wet bulb thermometer – Psychomotor. |
|
Plot position on chart (Lat & Long). Understand modern ship’s bridge equipment. |
|
2.9 |
Weather and tied data reading from the book- Basic (Not Required to write) |
Recognize the cardinal and inter-cardinal points of a compass. |
|
2.14 |
|
Demonstrate correct practice of heaving in or paying out a hawser on a warping drum. |
|
Demonstrate correct connection of Mandal and Tonsberge shackle. |
|
Hazards involved and precaution to take whilst passing tug rope. |
|
Part - 3 |
Cargo
handling and stowage at support level |
3.1 |
|
3.3 |
|
3.6 |
|
3.7 |
Demonstrate lifting /moving weight of different size and shapes using a lifting gear. |
3.9 |
|
3.10 |
|
3.12 |
Demonstrate lifting of bales, drums, cartons, pipes, gas bottles using the correct sling and slinging procedure. · Snotter / endless sling · Net sling / drum clamps · Log clamps / Pallet |
3.13 |
Fetch the correct size of block for a specific SWL. |
3.14 |
Oil & grease the wire rope as per safety guidline. |
3.15 |
Lashing carried out on · 200 liter drums · 20 liter drums · O2, Acetylene gas bottles · Crates · Plates |
3.17 |
Valves overhaul on deck. |
3.18 |
Ventilators for holds, tanks maintenance. |
Part - 6 |
Controlling
the operation of ship and care for person on board at support level |
6.1 |
Make a bend, Hitch and a knot for temporarily joining two ropes/ temporary joining a rope to structure. |
6.2 |
Demonstrate tying of all essential knots and hitches (10 different knots, reef knot, Clove hitch, Rolling hitch, Half hitch, Bowling on bight, Fisherman’s bend, Sheet bent, Single Carrick bend, Double Carrick bend, Monkey Fist, Timber hitch, Marline spike hitch, Sheep shank) |
6.3 |
Measuring the diameter of the rope. |
6.4 |
Identify manila polypropylene and other synthetic ropes and the precautions to be taken in using each. |
6.5 |
Carrying out various ropes types of whipping. |
6.6 |
Carrying out various types of rope splices. |
6.8 |
Uncoil and layout a rope from a new coil. |
6.9 |
Care and maintenance of natural and synthetic rope. |
6.11 |
Splice a permanent eye on the end of a wire rope. |
6.16 |
Inspection of rope for defects and criteria for rejection and replacement. |
6.18 |
Identify various types of blocks and tackles used different between rigging to advantage and disadvantage. |
6.19 |
Opening and maintenance of one set of block. |
6.20 |
Identify and understand use of snatch block |
6.21 |
Understand the relation to sheave diameter and rope diameter. |
6.23 |
Demonstrate safe practices of using eye bolts, slings, shackles ratchet block, and chain block for lifting and moving heavy deck item. Understand safe working load (SWL) of equipment used in lifting of loads. |
6.30 |
Taking tank sounding on a daily basis. |
6.31 |
Taking of tank ullage on a daily basis. |
6.32 |
Reading of draught mark, both in meter and feet. |
6.34 |
Understand the hazards and while using chemicals read MSDS sheets. |
6.35 |
Use high pressure water wash machine. |
6.37 |
Rig Bosun’s chair and lower himself using self-lowering hitch observing safety guidelines. |
6.38 |
Rig the stage for working and painting over side / aloft, complying with safety guidelines. |
6.39 |
To assemble and using scaffolding to work at heights. |
6.40 |
Rig the pilot ladder embark, disembark using the same observing safety guidelines. |
6.41 |
Rig a rope ladder for working over side, embark and disembark the ladder complying the safety guidelines. |
6.43 |
Rig and climb 5m telescopic ladder complying with safety guidelines. |
6.45 |
Rig and use portable ladder. |
6.46 |
Procedure for manual lifting with an actual weight. |
6.47 |
Climb the mast with appropriate safety measures |
6.48 |
Enter an enclosed space complying with safety procedure. |
6.49 |
Rigging and maintaining ventilation system prior entry and during the stay inside enclosed space. |
6.50 |
Use gas monitor and O2 analyzer to check atmosphere in the space is safe enough to enter. |
6.51 |
Use a multi gas detector prior entry into enclosed space. |
6.52 |
Use of approved permit system for enclosed space entry. |
6.53 |
Moving and stowing 200 ltr drums. |
6.54 |
Lifting 20 liter paint drum and stowing on the deck. |
6.56 |
Moving O2 cylinders and acetylene cylinders to a distance using two man lift and trolley. |
6.61 |
Identify and segregate garbage on daily basis in work area. |
6.62 |
Prepare garbage drum and stencil work. |
6.63 |
Understand connection of bunker hose to manifold using reducer. |
6.64 |
Importance of closing of all scuppers and drain plugs in drip trays on deck. |
6.65 |
Identify all equipment in SOPEP locker and understand the use of the items. |
6.66 |
Rig and use air driven pump and importance of collection of split oil and use of dispersant. |
6.67 |
Conduct of oil spill drill and related duties of each individual on board the vessel. |
2 Comments
123
ReplyDeleteKindly publish all journal/practical task of GSK
ReplyDelete